Industry news|2022-06-06| admin
The installation of the planetary gearbox is a relatively simple process, but some details need to be paid attention to during the installation process. The installation process of the planetary gearbox is roughly divided into three steps: inspection size, installation, and testing. The main thing is to confirm the planetary gear. The coaxiality of the gearbox during installation will have a great impact, so let's learn about the installation process of the planetary gearbox and some precautions!
Before installing the planetary gearbox and the motor, it is necessary to confirm whether they are in good condition, and it is necessary to check whether the dimensions of the connected parts match, mainly referring to whether the installation size between the motor and the gearbox is correct.
Send the screws of the dust-proof holes on the outer side of the planetary gearbox, adjust the position to align the side holes and the dust-proof holes, remove the motor shaft key, and carry out anti-rust treatment on the installation parts of the motor and the gearbox to ensure the tightness of the connection and the later operation. of fluency.
When connecting, it is necessary to ensure that the coaxiality between the two is consistent. If it is inconsistent, it will affect the later operation, wear the internal gear of the gearbox or break the shaft. During the installation process, it is forbidden to hit the gearbox with a hammer to prevent damage caused by excessive axial force or radial force.
When the gearbox and the motor are connected, first install the diagonal screws to ensure uniform force, then install the other two diagonal bolts, tighten the four mounting bolts one by one, and finally tighten the captive screws on both sides, some high-precision installation requires the use of a torque wrench.
After the gearbox is installed, it needs to be fixed on the bracket, and the stability of the installation needs to be ensured. If the gearbox is unstable during high-speed operation, it may cause vibration and external noise, which will indirectly affect the coaxiality of the installation. When gears or other components are externally installed during transmission, protective devices need to be installed. After the installation is completed, check the stability and flexibility of the installation parts in turn, and the idling test can be carried out. The operation process should be relatively stable, without obvious vibration and noise. When there are some abnormal phenomena, the problem should be eliminated.
The planetary gearbox needs to be carefully installed during the installation process. Good installation can achieve twice the result with half the effort. Installation according to standard procedures can save a lot of maintenance costs in the later period. If the coaxiality is inconsistent during installation, it will have a great impact on the later use and the gearbox itself. Therefore, during the installation of the gearbox, attention must be paid to the coaxiality of the gearbox and some details.
| 国产一级av大片 | 国产av永久网站 | 国产91精品人妻互换在线 | 3d动漫精品一区二区竹菊影视 | 午夜理理伦电影A片无码残囡 | 一夲道无码专区av无码a片 | 护士交换粗吟配乱大交动态图 | 17c在线观看视频国产 | 国产寡妇XXXX猛交草莓视频 | 亚洲无马黑料在线观看 | 亲子乱伦一区二区三区 | 99久久99久久精品國產片果凍 | 搡8o老女人老妇人老熟 | 人妻无码一区二区三区久 | 国产白丝护士喷白浆视频 | 天天射天天搞天天干绿帽淫妻 | A片性猛交ⅩXXX乱大交 | 国产一区在线午夜福利影片观看 | 中文字幕一区二区三区乱码 | 91人妻人人爽人人添夜夜爽直播 | 欧美freesex 交免费视频 | 女女同恋一区二区在线观看 | 日韩色情AV综合自拍一区 | 女教师一级爽A片免费 | 国产乱人伦真实精品视频 | 国产又粗又猛又爽又黄视频 | 成人做爰黄级爽爽视频直播网 | 真人一级婬片A片免费放四虎 | 少妇被黑人到高潮喷白浆 | 性感美女黄色视频网站 | 夜丝袜噜噜精品国产亚洲AV | 狠狠色噜噜色狠狠狠综合久久 | 陕西少妇性生交BBBBBB | 久久久久久久一区二区 | 精品无人区一区二区三区聊斋艳谭 | 精品国产一级黄色片网站 | 免费看的黄色视频网站 | 91人妻人人澡人人爽人人精吕 | 免费网站在线观看禁18进入 | 高清无码视频免费观看 |